ARTIC – Anaheim Regional Transportation Intermodal Center

  • Artic_Overall
  • Angels_Photo
  • P1030308_w
  • P1030310_w
  • P1030311_w
  • USC_nodes_Photo
  • USC_nodes

Project Info Owner: Anaheim Works, Designer Architect: HOK, Engineers: Buro Happold. As a world-class, development opportunity in Southern California, the Anaheim Regional Transportation Intermodal Center (ARTIC) will combine a transportation gateway and mixed-use activity center on a 16-acre site owned by the City of Anaheim. ARTIC will serve as a hub for Orange County and the region, a landmark where freeways, major arterials, bus routes and Orange County’s backbone rail system converge. ARTIC will also accommodate future plans for the Anaheim Rapid Connection (ARC) and high-speed trains. Overall Project Budget: $185 million Status: Under Construction Client: Vector Foiltec Exterior Envelop ETFE subcontractors Services Provided:

  •  3D Coordination model of the 60,000 sqf ETFE Enclosure structure.
  • Constructability Simulation and analysis
  • Fabrication drawing production.

Museum of Tolerance

  • MOTJ-Entry-Court_no-screen_FINAL_Caption2
  • MOT_Rhino_1
  • MOT_Rhino_2
  • MOT_STR_2_O
  • MOT_03_O
  • MOT_02_O
  •  
  • MOT_15
  • MOT_14
  •  

Project Info Owner: SWC Museum Corp., Architect: AEDAS LA Project Construction Budget: $40 million Status: Under construction Services Provided: In collaboration with AEDAS LA architects

  • Development and coordination of a live 3D model of: concrete structures, mechanical, electrical, plumbing systems and exterior finishes geometries.
  • The model will be used for MEP superpositioning drawings production and on field coordination and geometry verification.

Tivoli Village

  • tivoli10
  • tivoli1
  • tivoli9
  • tivol7

Project Info Owner: Great Wash Park, LLC. General Contractor: Hardstone Construction Located in the Summerlin area of Las Vegas, the program of this Mixed use development project accounts for:

  •      375,000 square feet of Dynamic retail and entertainment space.
  •      125,000 square feet of restaurant space.
  •      200,000 square feet of office space
  •      3,400 below grade parking spaces

Overall Project Budget: $720 million Status: Phase 1 completed for $350 million. Phase 2 is under construction Client: Hardstone Construction, General Contractor Services Provided: In collaboration with Patrick L’Heureux and Nicolas Cantin:

  • On site live 3D coordination model
  • Installation guidelines and Shop drawings for Concrete Structure, Exterior Stud walls, MEP systems.
  • Fabrication Drawings for MEP sleeves, Finish Stone and Ornamental Metal work
  • Quantity take offs for concrete, MEP and miscellaneous steel.

Hardstone Construction was awarded the ML100 Award in 2013 for innovative business for their use of parametric 3D models that we developed to improve the efficiency of the construction process.

Tivoli Village Case Study >